Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

WHSE Site Management Plan - Subcontractor

WHSE Site Management Plan - Subcontractor

Product SKU: 20008
WHSE Site Management Plan - Subcontractor Video

Other Details

PDF Download:
WHSESiteManagementPlan_Subcontractor_2015.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download Delivery
    • Provides a framework to manage the implementation of work health and safety for work being perfromed by contract workers, engaged by Principal Contractors
    • Suitable for subcontractors reporting to Principal Contractors 
    • Designed to assist you meeting legislative conformance
    • Subcontractor Site Management Plan includes an integrated environmental plan & waste management register 
WHSE Subcontractor Site Management Plan
Subcontractors are a critical section of the industry who can make a real difference to improving WHSE on building and construction sites. This plan outlines effective Subcontractor Site Management, particularly in relation to arrangements for WHS planning, inspections and most importantly, risk management.
 
Key Features:
  • Contractor Management
  • Emergency Management
  • WHS Entry Permits
  • Environmental Policy including waste management stream

 

Written to align with key elements from:

  • AS/NZS 4801, OHSAS 18001 and the Work Health and Safety Act & Regulations 2011 for construction
  • Australian Government (1999): Commonwealth Environment Protection and Biodiversity Conservation Act
  • AS/NZS 14001:2004: Environmental management systems – Requirements with guidance for use
 
Table of ContentsAmendment RecordDistribution Record Introduction Review Procedure Document Control Management Commitment & Approval Project Details Scope of Work
  • 1. Work Health & Safety (WHS) Policy
  • 2. Six Stage Commitment to WHS
  • 2.1 Communication & Consultation
  • 2.2 Hazard Identification, Risk Management & Controls
  • Roles, Responsibilities & Accountabilities
  • Contractor Management
  • 2.3 Training, Information & Supervision
  • 2.4 Incident Management
  • 2.5    Safe Work Method Statements Management
  • 2.6    Monitoring
  • 3.    Hazardous Chemicals
  • 4.    WHS Entry Permits
  • 5.    Emergency Management
  • First Aid
  • 6.    Electrical Safety
  • 7.    Government Authorities
  • 8.    Plant & Equipment
  • 9.    High Risk Construction Work
  • 10.    Purchasing & Delivery of Goods/Services
  • 11.    WHS Entry Permits
  • 12.    Return to Work (RTW)
  • 13.    Environmental Policy
  • Site Specific Environmental Risk Assessment & Control Summary
  • Site Specific Environmental Hazard Assessment Checklist
  • Waste Management
  • Appendix A: WHS Toolbox Meeting Record
  • Appendix B: Site Induction Checklist
  • Appendix C: Site Safety Rules
  • Appendix D: Incident Report Form
  • Appendix E: Hazard Report Form
  • Appendix F: SWMS Checklist
  • Appendix G: SWMS Template
  • Appendix H: Safe Work Method Statements (SWMS) Register
  • Appendix I: Risk Assessment Form
  • Appendix J: JSA
  • Appendix K: Hot Work Permit
  • Appendix L: Falls Prevention Checklist
  • Appendix M: Falls Emergency Rescue Plan
  • Appendix N: Electrical Safety Checklist
  • Appendix O: Electrical Equipment Register
  • Appendix P: Hazardous Chemicals / Dangerous Goods Register
  • Appendix Q: Plant & Equipment Register / Maintenance Log
  • Appendix R: Worker Training, Competency & Induction Register
  • Appendix S: Part 1 - Plant Hazard Checklist – powered mobile plant
  • Appendix S: Part 2 - Plant Hazard Checklist – non mobile plant
  • Appendix T: Plant & Equipment Hazard Register
  • Glossary
  • References
Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$195.00

PLUS GST

View Cart


QMS Special
Take $150 OFF Quality Management System Sale.

Add coupon code QUALITY at checkout.

You May Also Need...