Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Acrow Props SWMS

Acrow Props SWMS

Product SKU: 10362
Acrow Props SWMS Video
  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Acrow Props Safe Work Method Statement

Working with acrow props is considered a high risk construction activity. This Safe Work Method Statement covers the potential job steps, hazards and control measures associated with working Acrow Props when supporting overhead loads.  

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Acrow Props SWMS Content: 

  • High Risk Construction Work
    • Moving Plant
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
    • Structures or buildings involving structural alterations or repairs that require temporary support to prevent collapse

    •  

      Tilt up or pre-cast concrete 
    • Work carried out adjacent to a road, railway or shipping lane, and traffic corridor.    

  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps
    • Planning
    • Preparation
    • Pre-Operational Inspection
    • Operation
    • Maintenance
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

 

swmsformats.png

app-store-badge.png       google-play-badge.png

 

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


QMS Special
Take $150 OFF Quality Management System Sale.

Add coupon code QUALITY at checkout.

You May Also Need...