Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Concrete (Saw Core Drilling) SWMS 10

Concrete (Saw Core Drilling) SWMS 10

Product SKU: 10067
Concrete (Saw Core Drilling) SWMS 10 Video

Other Details

PDF Download:
Concrete_Sawcoredrilling_SWMS_10_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Concrete (Saw Core Drilling) Safe Work Method Statement

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, main hazards and controls associated with operating a hand held, electric or petrol/diesel powered concrete saw and core drill.  

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.  

Concrete (Saw Core Drilling) SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
    • Works carried out adjacent to a road, railway or shipping lane, traffic corridor
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Assess onsite conditions
    • Work are setup
    • Operating saw/drill
    • Working at elevated positions
    • Refuelling saw / drill on site
    • Remote and/or isolated work
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at. or works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


QMS Special
Take $150 OFF Quality Management System Sale.

Add coupon code QUALITY at checkout.

You May Also Need...

 


Product Videos

Silica Exposure (02:01)
Download high quality version here: http://tinyurl.com/2fttz7eSilica is a common substance found in sand, rock, and building materials such as concrete and brick. Cutting, grinding, or drilling these materials releases dangerous crystalline silica dust into the air. This video shows how breathing in silica dust can cause permanent damage to the lungs.
  • Silica Exposure
    Download high quality version here: http://tinyurl.com/2fttz7e...