Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Concrete - Steel Fixing SWMS 10

Concrete - Steel Fixing SWMS 10

Product SKU: 10254
Concrete - Steel Fixing SWMS 10 Video
  • Product Description
  • Product Reviews
  • View Sample
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Concrete Steel Fixing Safe Work Method Statement

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, main hazards, risks and controls associated with guidance on steel fixing including setting and tying steel reinforcing bar for concrete construction.

Examples of power tools include: Drills (electric, pneumatic, battery operated etc.), Chainsaws, Portable power tools, Angle grinders, Etc.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.  

Concrete Steel Fixing  SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Assess onsite conditions
    • Work area setup
    • Lifting steel by crane
    • Lifting steel by hand
    • Setting steel
    • Tying steel
    • Cutting steel with grinder or a metal drop saw
    • Electric and manual reinforcing bar cutters / benders
    • Using oxyacetylene equipment
    • Working adjacent to mobile plant or passing vehicles
    • Working at elevated positions
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at. or works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart

You May Also Need...