Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Concrete - Tilt-up Panels (precast panels) SWMS

Concrete - Tilt-up Panels (precast panels) SWMS

Product SKU: 10399
Concrete - Tilt-up Panels (precast panels) SWMS Video

Other Details

PDF Download:
Concrete_Tilt-Up_precastpanels_SWMS_10_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Concrete - Tilt-up Panels (precast panels) Safe Work Method Statement

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, main hazards and controls associated with the general safety of carrying out work that involves the casting of tilt-up / precast concrete panels. This includes formwork, steel fixing and concrete works.

This SWMS does not cover the lifting of tilt-up / precast panels into place. 

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

 

Concrete - Tilt-up Panels (precast panels) SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
    • Tilt up or pre-cast concrete
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Temporary Casting Bed-Design
    • Concrete Panel Design
    • Training and Capabilities
    • Assess onsite conditions
    • Work area set up
    • Laying temporary Casting beds
    • Erecting formwork
    • Powder actuated tools
    • Applying bond breakers / release agents
    • Setting steel reinforcement / lifting
    • Tying steel reinforcement
    • Placing and finishing concrete
    • Using troweling machine while finishing concrete
    • Removing / stripping formwork
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at. or works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


QMS Special
Take $150 OFF Quality Management System Sale.

Add coupon code QUALITY at checkout.

You May Also Need...