Loading... Please wait...

Go paperless! Get your FREE iAuditor SWMS with every SWMS purchased.

1300 306 604

Crane – Overhead – Bridge - Gantry SWMS 10

Crane – Overhead – Bridge - Gantry SWMS 10

Product SKU: 10177
Crane – Overhead – Bridge - Gantry SWMS 10 Video

Other Details

PDF Download:

  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Crane – Overhead – Bridge - Gantry Safe Work Method Statement

This Safe Work Method Statement (SWMS) is a comprehensive document covering the risk management processes and procedures associated with operation of a Bridge or Gantry Crane with both a manned cabin and remote controlled.  

This SWMS does not cover the transportation, erection or dismantling of a Gantry or Bridge Crane.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Crane – Overhead – Bridge - Gantry SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
    • Involves a risk of a person falling more than 2m, including work on telecommunications towers
    • Work carried out adjacent to a road, railway or shipping lane, traffic corridor
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Assess onsite conditions
    • Onsite access (Safe access and egress are provided to the crane and, while using remote control from ground)
    • Climbing the crane
    • Crane Pre start check
    • Select and inspect equipment
    • Communication
    • Pre lift assessment
    • Crane operation
    • Maintenance work on crane
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring  


app-store-badge.png       google-play-badge.png


For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews

This product hasn't received any reviews yet. Be the first to review this product!



View Cart

You May Also Need...