Loading... Please wait...

Go paperless! Get your FREE iAuditor SWMS with every SWMS purchased.

1300 306 604

Insulation Installation SWMS 10

Insulation Installation SWMS 10

Product SKU: 10145
Insulation Installation SWMS 10 Video

Other Details

PDF Download:

  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word to use this template (SWMS Template for use with iAuditor coming soon)

Insulation Safe Work Method Statement

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated with the installation, into ceilings and walls, of insulation batts / blankets in existing premises and structure under construction. 

For any work at heights over 2m (e.g. EWP, scaffolding etc.) a dedicated SWMS relating to these tasks should be used.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Insulation SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
    • Artificial extremes of temperature
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services 
    • Involves a risk of a person falling more than 2m, including work on telecommunications towers
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Conduct Risk Assessment
    • Remote and/or isolated work
    • Assess onsite conditions
    • Materials delivery
    • Work area set up
    • Entering ceiling space
    • Installing insulation materials
    • Confined spaces
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring  

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews

This product hasn't received any reviews yet. Be the first to review this product!



View Cart

You May Also Need...