Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Manual Handling – Building SWMS

Manual Handling – Building SWMS

Product SKU: 10168
Manual Handling – Building SWMS Video

Other Details

PDF Download:
Manual_Handling_SWMS_Sample_2015.pdf
Product Video:


  • Product Description
  • Product Reviews
  • View Sample
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Manual Handling (Building) Safe Work Method Statement

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, main hazards, risks and controls associated associated with hazardous manual handling tasks in the building industry. This SWMS also includes a Hazardous Manual Tasks Risk Assessment Form. 

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.  

Manual Handling (Building) SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Conduct a risk assessment identifying potential hazardous manual tasks
    • Training and Capabilities
    • Work area set up, placement of equipment and materials & construction installations e.g. plasterboard, painting, concrete etc
    • Operating non-mobile plant e.g. jackhammers, power tools, powder actuated tools etc.
    • Operating powered mobile plant
    • Working near powered mobile plant
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 
  • Hazardous Manual Tasks Risk Assessment

swmsformats.png app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at. or works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart

You May Also Need...