Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Plasterboard Installation SWMS 10

Plasterboard Installation SWMS 10

Product SKU: 10195
Plasterboard Installation SWMS 10 Video

Other Details

PDF Download:
PlasterBoard_Installation_SWMS_10_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Plasterboard Installation Safe Work Method Statement

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated with the fixing and setting of plasterboard sheets to walls and ceilings in buildings. It also covers the application of cornice.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.  

Plasterboard Installation SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services 
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Assess onsite conditions
    • Unloading / storage of working materials
    • Work area set up
    • Cutting plasterboard / cornice
    • Applying adhesive / compounds to fix and set plasterboard / cornice
    • Fixing plasterboard
    • Applying compounds and fillers to fixed plasterboard and applying cornices
      • Covers potential hazard of 'Falls from stilts' plus more
    • Sanding
    • Using power tools
    • Remote and/or isolated work
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


  1. Quick,Efficient,Serves a purpose

    Posted by on

    Easy to access
    Well laid out
    Easy to alter to site specific
    Satisfies the powers to be


  2. Eazy..

    Posted by on

    Good swms .eazy .


$79.95

PLUS GST

View Cart


QMS Special
Take $150 OFF Quality Management System Sale.

Add coupon code QUALITY at checkout.

You May Also Need...