Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Plumbing (Pump - Valve) Installation SWMS 10

Plumbing (Pump - Valve) Installation SWMS 10

Product SKU: 10361
Plumbing (Pump - Valve) Installation SWMS 10 Video

Other Details

PDF Download:
Plumbing_pump-valve_Installation_SWMS_10_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Pump - Pump Motor Installation Safe Work Method Statement

This SWMS covers the removal and installations of industrial pumps and pump motors. Covered in this SWMS is the loading/unloading materials, work area set up, lifting by crane where necessary, and testing of new installations. 

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Pump - Pump Motor Installation SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
    • Asbestos
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services 
    • In or near water or other liquid that involves risk of drowning
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Assess onsite conditions
    • Delivery of materials (pumps, motors)
    • Work area setup
    • Hot works
    • Disconnecting an existing pump/motor/valve
    • Lifting pumps - motors - valves into/out of position
    • Gasket removal / Flange cleaning
    • Replace / fit new pump / motor
    • Working at elevated levels
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring  

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


QMS Special
Take $150 OFF Quality Management System Sale.

Add coupon code QUALITY at checkout.

You May Also Need...