Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Rendering SWMS 10

Rendering SWMS 10

Product SKU: 10310
Rendering SWMS 10 Video

Other Details

PDF Download:
Rendering_SWMS_10_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Rendering Safe Work Method Statement

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated with the application of cement render to brick and block walls.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Rendering SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant
    • Involves a risk of a person falling more than 2m, including work on telecommunications towers   
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Assess onsite conditions
    • Work area setup
    • Surface preparation
    • Mixing the render
    • Application, finishing & curing the render surface
    • Working at elevated positions
    • Using power tools
    • Remote and/or isolated work
    • Refuelling the cement mixer on site
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


  1. Has everything you need for a basic rendering SWMS

    Posted by on

    After spending over a week trying to do up my own SWMS for mine and my husbands new business, it was taking up so much time that I didn't have. After having a look at my options online, safety culture was not only great on price but had exactly what I needed and it literally took 5 minutes to buy and print out. I felt very relieved :)
    10/10
    Thanks guys!


$79.95

PLUS GST

View Cart

You May Also Need...