Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Bobcat - Skid-Steer Loader Operation SWMS

Bobcat - Skid-Steer Loader Operation SWMS

Product SKU: 10027
Bobcat - Skid-Steer Loader Operation SWMS Video

Other Details

PDF Download:
bobcat_skid_steer_loader_operation_SAMPLE.pdf
Product Video:


  • Product Description
  • Product Reviews
  • View Sample
Instant Download via Email
  • Complies with current legislation in all States and Territories
  • Instant Download delivered via email
  • MS Word and IAT (iAuditor App) format for easy customisation/editing
  • Downloading and Customising Instructions provided
  • Assists with compliance requirements for WHS inspections
  • Review Date: March 2016

The Bobcat - Skid-Steer Loader Safe Work Method Statement (SWMS) is a comprehensive procedure outlining the safety steps, main hazards, risks and controls associated with the operation of a Diesel powered Bobcat / Skid-Steer Loader.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Document Format
This Safe Work Method Statement (SWMS) is provided in the following document formats 

iat-word-files.jpg

 

app-store-badge.png google-play-badge.png

 

This SWMS includes:

  • Consultation
  • Project details
  • Hierarchy of Controls
  • Risk Assessment Matrix
  • PPE
  • High Risk Contsruction Work
  • Planning & Prepartion with Principal Contractor
  • Pre start equipment inspection
  • Operation
  • Contact with overhead power lines
  • Re-fuelling
  • Potential hazards
  • Risk Controls
  • Inherent & Residual risk-ratings
  • Emergency Procedures / Response
  • Legislative references
  • Employee sign off section

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.

Product details:

  • Written by ex WHS inspectors
  • Easy customisation with MS Word format (NOT PDF)
  • Risk ratings before and after control measures
  • Provides a framework for training workers
  • Can be used as part of tender applications, WHS inductions, and Toolbox talks

Related Items:

 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart

You May Also Need...

 


ABOUT SSL CERTIFICATES