Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Excavator Operation SWMS 10

Excavator Operation SWMS 10

Product SKU: 10533.1
Excavator Operation SWMS 10 Video
  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • This SWMS covers:
    • Excavator, Bobcat Skidsteer, Backhoe, Dozer, Front end loader, Grader, Scraper, Tractor and Track loader-drott
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • You must have Microsoft Word or iAuditor to use this template

Excavator Operation - Mobile Plant Safe Work Method Statement

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated with the operation of mobile plant associated with earthworks. This SWMS also contains a pre start checklist.

Suitable for businesses operating the following mobile plant:

  • Skidsteer
  • Backhoe
  • Excavator
  • Dozer
  • Front end loader
  • Grader
  • Scraper 
  • Track loader-drott

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.  

Excavator Operation - Mobile Plant SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services 
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Assess onsite conditions
    • Delivery and removal of mobile plant
    • Pre start check (Pre start checklist contained in this SWMS)
    • Worker consultation
    • Entering or exiting cabin
    • Operation
    • Changing buckets or other attachments
    • Backhoe attachment
    • Lifting machine (e.g. with crane)
    • When working outside of machine / cabin
    • Maintenance on site
    • Refuelling on site
    • On completion
    • Avoiding plant roll-over
    • Plant Roll-over Emergency Response Procedures
  • Mobile Plant Pre-Start Checklist
  • Emergency Response
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


QMS Special
Take $150 OFF Quality Management System Sale.

Add coupon code QUALITY at checkout.

You May Also Need...