Safe & Happy Holidays from SafetyDocs!
Our team are on holiday from 5pm Fri 22nd Dec until 8:30am Tues 2nd Jan (AEST). Our store remains open 24/7 for instant product downloads.

People wearing full hazardous protection suits working from an EWP removing parts of a roof.

Asbestos Safe Handling < 10 sqm. Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Asbestos Safe Handling (< 10 sqm.) Safe Work Method Statement

This Asbestos Safe Handling (< 10 sqm.) Safe Work Method Statement (SWMS) covers hazards and controls when working with or removing small amounts non-friable asbestos less than 10 m2 in area. (No licence required).

This SWMS should be used for minor work in which asbestos or asbestos-containing materials (ACM) are encountered in the workplace. Examples may be drilling into, painting or replacing a small section of non-friable asbestos sheeting wall or removing non-friable asbestos lagging for a pipe repair.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Asbestos disturbance

Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Asbestos Safe Handling (< 10 sqm.) SWMS: 

(includes potential hazards & control measures).

  1. Planning
  2. Working Outdoors
  3. Arrival On-site & Assess On-site Conditions
  4. Work Area Set-up
  5. Environment
  6. Housekeeping
  7. Manual Tasks
  8. Removing Small Sections (<10sqm) of ACM
  9. Removing Small Sections (<10sqm) of Asbestos Cement Sheeting
  10. Removing Small Sections (<10sqm) of Floor Tiles Containing Asbestos
  11. Removing Small Sections (<10sqm) of Bituminous Products, (i.e. roofing felt or roll roofing products)
  12. Removing Small Sections (<10sqm) of Ceiling Tiles Containing Asbestos
  13. Removing Small Sections (<10sqm) of Lagging on Pipework/Plant Containing Asbestos
  14. Working with Powered & Non-powered Tools on Asbestos
  15. Drilling Asbestos
  16. Paint/Repaint ACM
  17. Collection & Disposing of Asbestos Waste
  18. On Completion
  19. Emergency Response
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Asbestos Safe Handling (< 10 sqm.) Safe Work Method Statement

This Asbestos Safe Handling (< 10 sqm.) Safe Work Method Statement (SWMS) covers hazards and controls when working with or removing small amounts non-friable asbestos less than 10 m2 in area. (No licence required).

This SWMS should be used for minor work in which asbestos or asbestos-containing materials (ACM) are encountered in the workplace. Examples may be drilling into, painting or replacing a small section of non-friable asbestos sheeting wall or removing non-friable asbestos lagging for a pipe repair.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Asbestos disturbance

Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Asbestos Safe Handling (< 10 sqm.) SWMS: 

(includes potential hazards & control measures).

  1. Planning
  2. Working Outdoors
  3. Arrival On-site & Assess On-site Conditions
  4. Work Area Set-up
  5. Environment
  6. Housekeeping
  7. Manual Tasks
  8. Removing Small Sections (<10sqm) of ACM
  9. Removing Small Sections (<10sqm) of Asbestos Cement Sheeting
  10. Removing Small Sections (<10sqm) of Floor Tiles Containing Asbestos
  11. Removing Small Sections (<10sqm) of Bituminous Products, (i.e. roofing felt or roll roofing products)
  12. Removing Small Sections (<10sqm) of Ceiling Tiles Containing Asbestos
  13. Removing Small Sections (<10sqm) of Lagging on Pipework/Plant Containing Asbestos
  14. Working with Powered & Non-powered Tools on Asbestos
  15. Drilling Asbestos
  16. Paint/Repaint ACM
  17. Collection & Disposing of Asbestos Waste
  18. On Completion
  19. Emergency Response
PDF Download
PDF File

Hear From Our Customers

  • 5

    Prompt efficient service

    Prompt efficient service

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View