Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Ceiling Installation - Suspended Grid System SWMS 10

Ceiling Installation - Suspended Grid System SWMS 10

Product SKU: 10043
Ceiling Installation - Suspended Grid System SWMS 10 Video

Other Details

PDF Download:
Ceiling_suspendedgridsystem_Installation_SWMS_10_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Ceiling (suspended grid system) Installation Safe Work Method Statement

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated with the installation of a basic suspended ceiling grid system with drop-in tiles.  

For any work at heights over 2m (e.g. EWP, scaffolding etc.) a dedicated SWMS relating to these tasks should be used.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.  

Ceiling (suspended grid system) Installation SWMS Content: 

  • High Risk Construction Work
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services 
    • Involves a risk of a person falling more than 2m, including work on telecommunications towers
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Assess onsite conditions
    • Unloading / storage of ceiling materials
    • Work area set up
    • Ceiling hanger and tile installation following manufacturers instructions
    • Working on scaffolding to install ceiling hanger and tiles
    • Working on an EWP to install ceiling hanger and tiles
    • Working on ladders and trestles to install ceiling hanger and tiles
    • Using power tools
    • Remote and/or isolated work
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at. or works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


QMS Special
Take $150 OFF Quality Management System Sale.

Add coupon code QUALITY at checkout.

You May Also Need...