Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Pipework - Maintenance - Hazardous SWMS

Pipework - Maintenance - Hazardous SWMS

Product SKU: 10358
Pipework - Maintenance - Hazardous SWMS Video
  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • Complies with current legislation in all States and Territories
  • Instant Download delivered via email
  • MS Word and IAT (iAuditor App) format for easy customisation/editing
  • Downloading and Customising Instructions provided
  • Assists with compliance requirements for WHS inspections
  • Review Date: 31 July 2014

The Pipework – Maintenance – Hazardous Safe Work Method Statement (SWMS) is a comprehensive procedure outlining the safety steps for the minor maintenance of pipework that have contained hazardous chemicals.

The Pipework – Maintenance - Hazardous Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall WHS System.

This SWMS involves maintenance works being undertaken on UPVC pipes where chemicals (such as sodium hypochlorite) are present. This SWMS does not cover excavation works, working in a confined space and/or a trench in sufficient detail and should be used in conjunction with applicable SafetyCulture SWMS. Ensure dedicated SWMS are implemented for hazards not covered in this SWMS.

 

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

 

Document Format
This Safe Work Method Statement (SWMS) is provided in the following document formats 

iat-word-files.jpg

app-store-badge.pnggoogle-play-badge.png

 

Main hazards:

  • Hit by moving vehicle
  • Exposure to hazardous substances / harmful atmosphere
  • Exposure to fluids under pressure, possible explosions
  • Crushing (trench failure, caught between pipes etc)
  • Musculoskeletal Disorder (MSD) from hazardous manual tasks
  • Falls
  • Environmental Impacts (noise, soil & water contamination, disruption of ground water & native flora/fauna)

This SWMS includes the following High Risk Construction Work as defined by Work Health and Safety Regulations 2011:

  • Mobile plant
  • Chemicals in pipework
  • Confined space*
  • Possible excavation/tunnel works (1.5m or more)*

* Ensure a dedicated SWMS is developed for these High Risk Tasks.

The Pipework – Maintenance - Hazardous Work Method Statement can be used as part of your WHS inductions, for Tool box talks or tender applications.

The Pipework – Maintenance - Hazardous SWMS includes:
 

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • Review
  • References
  • Employee Sign off Section
  • Hierarchy of Controls
  • Risk Assessment Matrix

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.

Product details:

  • Written by ex WHS inspectors
  • Risk ratings before and after control measures
  • Provides a framework for training workers
  • Can be used as part of tender applications, WHS inductions, and Toolbox talks

 

Related items:

Planning: (extract only)

Ensure a safe system of work in place for chemical piping. Example:

  • All pipework are labelled for the type of substance (chemical name, biological contaminant etc)
  • Correct flow velocity and pressure
  • Regular inspections of pipe integrity
  • Regular inspections of pipe interiors to prevent build-up / concentrations of hazardous substances and / or pressure
  • Joins are the correct type of substance being piped (example: no threaded joins. If threaded joins must be used, they must have been installed new, sharp, secured correctly and caustic-resistant
  • All piping installed by competent persons and meets required design specifications

Ensure correct Personal Protective Equipment (PPE) for tasks. Seek information from Safety Data Sheets (SDS) and competent persons. PPE must be suitable for level of exposure.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


QMS Special
Take $150 OFF Quality Management System Sale.

Add coupon code QUALITY at checkout.

You May Also Need...