Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Concrete - Prep. and Lay - WMS - NZ

Concrete - Prep. and Lay - WMS - NZ

Product SKU: 110103
Concrete - Prep. and Lay - WMS - NZ Video
  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • Identify hazards and effectively assess suitable control measures associated with concrete preparation and laying
  • Suitable for New Zealand businesses
  • Instant Download delivered via email
  • Save time with our pre-filled, fully customisable template
  • MS Word format for easy customisation/editing

Stay safe during concrete preparation and laying works, clearly outline the possible safety/environmental hazards and control measures associated with this ready to use Safe Work Method (SWM) document.

This SWM covers general aspects associated with handling, delivery and placement of wet concrete. This does not include tilt-up / pre-form slabs, formwork, and work at heights or use of machinery associated with concrete delivery in sufficient detail.

Main hazards:

  • Exposure to alkaline substances (skin, allergic and irritant dermatitis, eye, mucous membranes - respiratory tract injuries)
  • Slips, trips, falls
  • Working At Height
  • Being struck by moving objects
  • Being struck by mobile plant
  • Musculoskeletal Disorder (MSD) from hazardous manual tasks
  • Electric shock
  • Exposure to hazardous atmosphere – crystalline silica

 The SWM provides:

  • a framework for training workers 
    • help workers understand necessary requirements needed to perform concrete preparation and laying tasks safely
  • a way to document identified hazards and describe control measures
  • a signed record of workers trained

Document Format

This Safe Work Method (SWM) is provided in Microsoft Word, meaning you can fully customise the document to suit the needs of your business. Simply add your company details and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing.  

The Concrete Preparation & Laying SWM includes: 

  • Management Commitment & Approval
  • PPE
  • Safety Notes
  • Job Steps
    • Planning 
    • Preparation
    • Pre-Operational Inspection
      Operation
    • Cleaning & Maintenance
  • Employee sign off section 

 

Related Products

We recommend you use this Safe Work Method template in conjunction with the SafetyCulture JSA Pack or Risk Assessment

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$49.95

PLUS GST

View Cart


QMS Special
Take $150 OFF Quality Management System Sale.

Add coupon code QUALITY at checkout.

You May Also Need...