Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Construction OHS Site Management Pack - Principal Contractor (Victoria)

Construction OHS Site Management Pack - Principal Contractor (Victoria)

Product SKU: 50029
Construction OHS Site Management Pack - Principal Contractor (Victoria) Video

Other Details

PDF Download:
Construction_OHS_SiteManagementPack_PrincipalContractor_sample.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download Delivery
  • Provides a framework to manage the implementation of occupational health and safety for principal contractors controlling construction works in Victoria 
  • Designed to assist you meeting legislative conformance. Aligns with OHS Act 2004 & OHS Regulations 2007
  • The Construction Site WHS Management Pack includes a OHS Management System, a HS Co-ordination Plan and OHS Induction Handbook
OHS Management System
The Principal Contractor Construction Site Management Pack is a comprehensive document, which provides a method of stating how you, your workers, subcontractors, visitors and anyone else are expected to behave when on Company property or performing Company related activities. The system includes a collection of policies & procedures, emergency plan, forms and checklists.
Principal contractors are by The Regulations required to provide a "safe system of work". This means you need a method of communicating and implementing a way of working safely. The basis for this process begins with your Occupational Health & Safety Management System. This management system has been developed in accordance with the Occupational Health & Safety Act 2004 and Occupational Health & Safety Regulations 2007.
Table of Contents Amendment Record Distribution Record Introduction Review Procedure Document Control Management Commitment & Approval

Section 1 CONSULTATION, COOPERATION & COORDINATION

  • 1.1 Consultation, Cooperation & Coordination Policy
  • 1.2 Consultation, Cooperation & Coordination Procedure
  • 1.2.1 OHS Meeting / Toolbox Talk Record
  • 1.3 Issue Resolution Policy
  • 1.4 Issue Resolution Procedure
  • 1.4.1 Issue Resolution Procedure - Flow Chart
  • 1.5 Remote & Isolated Work Policy
  • 1.6 Remote & Isolated Work Procedure
  • 1.6.1 Remote / Isolated Work Plan
Section 2 RISK MANAGEMENT
  • 2.1 Risk Management Policy
  • 2.2 Risk Management Procedure
  • 2.2.1 Risk Management Procedure Flow Chart
  • 2.2.2 Job Safety Analysis
  • 2.2.3 Risk Assessment Form
  • 2.2.4 Risk Register
  • 2.3 Objectives & Targets Policy
  • 2.4 Objectives & Targets Procedure
  • 2.5 Roles, Responsibilities & Accountabilities Policy
  • 2.6 Roles, Responsibilities & Accountabilities Procedure
  • 2.7 Occupational Health & Safety (OHS) Policy
  • 2.8 Occupational Health & Safety Procedure
  • 2.9 Contractor Management Policy
  • 2.10 Contractor Management Procedure
  • 2.10.1 Site Contractors Register
  • 2.10.2 Contractor Evaluation Form
  • 2.10.3 Contractor Spot Inspection Form
  • 2.10.4 Conformance Report
  • 2.10.5 Permit To Work
Section 3 MONITORING & REVIEWING
  • 3.1 Legislative Change Policy
  • 3.2 Legislative Change Procedure
  • 3.2.1 OHS Legislation Register
  • 3.3 Management Review Policy
  • 3.4 Management Review Procedure
  • 3.5 Compliance Evaluation Policy
  • 3.6 Compliance Evaluation Procedure
  • 3.7 External Auditing Procedure
  • 3.8 Internal Auditing Procedure
  • 3.8.1 Site Inspection Checklist
  • 3.9 Document & Record Keeping Policy
  • 3.10 Document & Record Keeping Procedure
  • 3.10.1 OHS Document Register
  • 3.10.2 Site Inspection Checklist – Daily
  • 3.10.3 Site Inspection Checklist – Weekly
  • 3.10.4 Site Inspection Checklist – Monthly           
  • 3.10.5 Site Inspection Checklist – 6 Months – 10 Years

Section 4 INCIDENT & HAZARD REPORTING

  • 4.1 Incident Reporting Policy
  • 4.2 Incident Reporting Procedure
  • 4.3 Incident Investigation Procedure
  • 4.3.1 Guidance Notes for Incident Investigation
  • 4.3.2 Hazard Profile
  • 4.3.3 Hazard Report Form
  • 4.3.4 Incident / Injury Report Form
  • 4.3.5 Incident / Near Miss / Hazard Report Register
  • 4.4 Reporting Policy
  • 4.5 Reporting Procedure

Section 5 EMERGENCY MANAGEMENT

  • 5.1 Emergency Management Plan
  • 5.2 Emergency Management Policy
  • 5.2.1 Facility Description
  • 5.2.2 Workplace / Facility Plan
  • 5.2.3 Evacuation Plan
  • 5.3 Evacuation Communication Procedure
  • 5.4 Emergency Evacuation Procedure
  • 5.4.1 Emergency Contact Numbers
  • 5.4.2 Emergency Management Personnel
  • 5.5 General Emergency Response Procedure
  • 5.6 Fire Fighting Equipment Procedure
  • 5.7 Fire Extinguisher Use
  • 5.8 Electric Shock / Electrocution - Emergency Response Procedure
  • 5.9 Hazardous Substance Emergency Management
  • 5.10 Hazardous Substance Emergency Response Equipment
  • 5.11 Hazardous Substance Spill Emergency Response
  • 5.12 Hazardous Substance Emergency Response – Minor Fuel / Oil Spill
  • 5.12.1 Emergency Response Drill Register
  • 5.13 First Aid
  • 5.14 First Aid Policy
  • 5.15 First Aid Procedure
  • 5.16 Medical Emergency Procedure
  • 5.16.1 First Aid Employee Register
  • 5.17 Information, Training & Instruction
  • 5.17.1 First Aid Training Register  

Section 6 HAZARDOUS WORK 

  • 6.1 High Risk Construction Work Policy
  • 6.2 High Risk Construction Work Procedure
  • 6.2.1 High Risk Licence Checklist 
  • 6.2.2 High Risk Work Licence Table
  • 6.3 Hot Work Management
  • 6.3.1 Hot Work Permit
  • 6.4 Safe Work Method Statement Management
  • 6.4.1 Safe Work Method Statement Checklist
  • 6.4.2 Safe Work Method Statement Template
  • 6.4.3 Safe Work Method Statement Register
  • 6.5 Electrical Safety Policy
  • 6.6 Electrical Safety Procedure
  • 6.6.1 Electrical Equipment Register
  • 6.6.2 Electrical Safety Checklist
  • 6.7 Excavation Policy
  • 6.8  Excavation Procedure
  • 6.9  Excavation Methods
  • 6.9.1 Excavation Safety Inspection Checklist
  • 6.10  Hazardous Manual Tasks Policy
  • 6.11 Hazardous Manual Tasks Procedure
  • 6.11.1 Discomfort Survey
  • 6.11.2 Hazardous Manual Tasks Register 
  • 6.11.3 Hazardous Manual Task Risk Assessment Form
  • 6.12  Hearing Protection & Audiometric Testing Policy
  • 6.13 Hearing Protection & Audiometric Testing Procedure
  • 6.14 Noise Assessment Procedure
  • 6.14.1 Noise Monitoring Register
  • 6.14.2 Noise Risk Register
  • 6.14.3 Audiometric Testing Register
  • 6.15 Falls Prevention Policy
  • 6.16 Falls Prevention Procedure
  • 6.16.1 Falls Prevention Checklist
  • 6.16.2 Falls Emergency Rescue Plan

Section 7  PLANT, EQUIPMENT & STRUCTURES

  • 7.1 Plant & Equipment Policy
  • 7.2 Plant & Equipment Procedure
  • 7.2.1 Plant & Equipment Register / Maintenance Log
  • 7.2.2 Vehicle Inspection Checklist           
  • 7.2.3 Plant Risk Assessment Form           
  • 7.3 Personal Protective Equipment (PPE) Policy
  • 7.4 Personal Protective Equipment (PPE) Procedure
  • 7.4.1 Personal Protective Equipment (PPE) Register
  • 7.5  Purchasing Policy
  • 7.6  Purchasing Procedure
  • 7.6.1 Purchasing Record   

Section 8 HAZARDOUS SUBSTANCES & DANGEROUS GOODS

  • 8.1 Hazardous Substances & Dangerous Goods Policy           
  • 8.2 Hazardous Substances & Dangerous Goods Procedure
  • 8.2.1 Hazardous Substance Manifest
  • 8.2.2 Hazardous Substances / Dangerous Goods Register
  • 8.2.3 Hazardous Substances / Dangerous Goods Key
  • 8.2.4  Hazardous Substance Risk Assessment Form
  • 8.3 Health Surveillance Policy
  • 8.4 Health Surveillance Procedure
  • 8.5 Health Surveillance Record 

Section 9 HEALTH & WELFARE

  • 9.1 Fitness for Work Policy
  • 9.2 Fitness for Work Procedure
  • 9.3  Drug & Alcohol Policy
  • 9.4 Drug & Alcohol Procedure
  • 9.5 Fatigue Management Plan
  • 9.6 Fatigue Management Policy
  • 9.7 Fatigue Management Procedure
  • 9.7.1 Fatigue Risk Assessment Form       
  • 9.8  Return to Work Program    
  • 9.8.1 Return To Work Plan
  • 9.9 Mobile Phone Policy
  • 9.10 Mobile Phone Procedure    
  • 9.11 Sun Safety Policy
  • 9.12  Sun Safety Procedure          
  • 9.13 Workplace Bullying Policy   
  • 9.14 Workplace Bullying Procedure       
  • 9.14.1 Workplace Bullying Flow Chart      

Section 10 INDUCTION & TRAINING    

  • 10.1 Training, Competency & Induction Policy 
  • 10.2 Training & Competency Assessment Procedure
  • 10.3 Site Induction Procedure
  • 10.3.1 Site Safety Rules
  • 10.3.2 Site Induction Checklist
  • 10.3.3 Employee Training, Competency & Induction Register

Employee Agreement Glossary References

 

Construction HS Co-ordination Plan
The Construction Health & Safety Co-ordination Plan (CHSCP) will assist in meeting Occupational Health and Safety obligations under the Occupational Health & Safety (OHS) Act 2004 and OHS Regulations 2007 and includes processes in place for the management of projects. Principal contractors are by The Regulations required to have a health and safety co-ordination plan for construction projects valued at $350,000 or more. The Construction HS Co-ordination Plan must be developed prior to the commencement of any works.  

Table of Contents Amendment Record Distribution Record  Introduction Review Procedure Document Control Management Commitment & Approval     

1. Project Details      

2. Site Plan    

3. Occupational Health & Safety (WHS) Statement           

4. Consultation & Representation

5. Risk Management

  • XYZ Company Proprietary Limited OHS Organisational Chart
  • Contractor Management

6. Incident Management

  • Incident Reporting Flow Chart
  • Notifiable Incidents

7. Emergency Management

  • Site Description
  • Site Plan
  • Emergency Contact Numbers
  • Emergency Management Personnel
8. Hazardous Work
  • High Risk Construction Work
  • Safe Work Method Statements
  • Electrical Safety
9. Hazardous Substances
10. Plant & Equipment
  • Personal Protective Equipment
11. OHS Entry Permits
12. Purchasing & Delivery of Goods/Services
13. Return to Work (RTW)
14. Information, Training & Instruction
  • Appendix A: Plant Hazard Checklist – powered mobile plant
  • Appendix S: Part 2 - Plant Hazard Checklist – non-mobile plant
  • Appendix B: Site Induction Checklist
  • Appendix C: Site Safety Rules
Glossary
References 
Employee Induction Handbook
A site-specific induction prior to the commencement of any works assists with understanding the hazards, risks, controls and safety rules that apply to a site. A site-specific induction must be complete for all employees carrying out construction works. 
Table of Contents
Welcome to XYZ Company Proprietary Limited
  • Site Plan
  • OHS Statement
  • OHS Organisational Chart
  • Site Safety Rules
  • Site Induction Checklist

A PDF Sample of the Construction HS Co-ordination Plan and OHS Management System can be found by clicking on the PDF Sample tab at the top. Note: You will need Microsoft Word on your computer to use this template.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$995.00

PLUS GST

View Cart


QMS Special
Take $150 OFF Quality Management System Sale.

Add coupon code QUALITY at checkout.

You May Also Need...