 Tilt-Up Pre-Cast Concrete Panels Safe Work Procedure or Work Method Statement The six page Tilt Up Safe Work Procedure for Concrete Panels should be kept on site, used for Inductions and also can be submitted as part of an OHS Safety Plan. The procedure includes:
- Site Awareness
- Preparation
- Pre-start Bracing
- Exclusion Zones
- and more
The Procedure is in MSWord Format and is email ready. It is generally emailed within six business hours. Referenced from: - Queensland – Tilt-up and Pre-cast Construction Code of Practice
- Australian Standards AS3850 – Tilt-up concrete construction.
- OSHA – USA – Tilt-Up Panel Construction Hazard – Safety and Health Information Bulletin
- Tilt-Up Concrete Association – USA - FAQ – Bracing Issues.
- WorkSafe Victoria
For a complete list of Construction Industry Safe Work Procedures or Work Method Statements click here. For OHS News about Pre-Cast Concrete Tilt Up Panels click here |