Safety Culture
OHS SystemsWork Method
Statements
Safety
Training
OHS AuditsSafety ShopOHS News
Residential Construction Industry
Air Compressor
Asbestos
Backhoe or Front End Loader
1
11Bob Cat & Skid Steer
Brick Laying
Brick Saw
Carpet Laying
1
1 1 Cement Render
1
11Circular Saw
1
11Cleaning Up Building Sites
1
11Concrete Preperation and Laying
1
1 1 Confined Spaces
1
11 Cornice Fixing
1
11Demolition Work
1
11Grinder (Freehand)
1
11Hiab Crane or Truck Loading Crane
1
11Incident Report Form
1
11Jack Hammer
1
11Job Safety Analysis
1
11Ladders
1
11Large Excavators
1
11Manual Handling
1
11Mini Excavators
1
1 1 Oxy Acetylene
1
11Permit To Work
1
11Operating Power Tools
1
1 1 Plasterboard Fixing
1
1 1 Plasterboard Setting
1
11Pressure Cleaner
1
11Rigging Safety
1
11Working On Roofs
1
11Safety Harnesses
1
11Scaffolding
1
11Steel Construction
1
11Tilt Up Pre-Cast Concrete Panels
1
11Trench Work
1
11Trestles
1
11Trucks (Loading/Unloading)
1
11Underground Cable Locating
1
11Vehicle Accident Procedure
1
11Wacker Packer
1
1 1 Waterproofing Bathroom and Laundries
1
11Welder (Electric)
1
11Working Around Electricity
1
11Construction Site Safety Plan
1
1Commercial Construction Industry
1
1 Engineering
1
1Concrete Safety
1
1Earth Moving
1
1Industrial Safety
1
1Transport Industry
1
1 Electricians
1
1Plumbing Safety
1
1Painting Safety
1
1Steel Work Industry
1
1 Carpentry Industry
1
1 Cabinet Makers
1
1Custom Procedures
1
1Garden Contractors
1
1Food And Kitchen Safety
1OHS Policies
1Complete OHS System
1 OHS Diary
1 Training DVDs

Backhoe or Front End Loader - Safe Work Procedure or Work Method Statement

 

Backhoe operation can be performed safely when correct procedures are used. The five page Backhoe or Front End Loader is a five page safety procedure that includes:

  • Site Risk Assessment
  • Operators Requirements
  • Planning
  • Loading and Unloading from a Truck or Tralier
  • Prestart Safety Checks
  • Machine Access, Seating and more.
  • 5 Page Complete Procedure
  • MS Word Format
  • Ready to Use
  • Version 4.0
  • Suitable For Sub-Contractors & Employees

 

 

Backhoe_safety

Back      Buy Now $79.95 plus GST

 

Backhoe or Front End Loader Safety Notes

Day Operations:
Safety footwear, hearing protection, high visibility shirt or vest, hard hat and sun protection if required (broad brim hat, sun screen, tinted safety glasses).

Night Operations:
As above but with a safety vest or shirt and helmet suitable for night work (i.e. Rated D/N with reflective strips).

Public safety – Where required the site should be barricaded off to ensure the public is not placed in harms way. (Example – Working on footpaths)

Traffic flow – Accessing and exiting the work site. (Especially important if deliveries are being made or spoil removed.)
Location of services both above and below ground.

 

Backhoe_Safety

Changing Buckets or Attachments

Place bucket and or attachment on firm level ground. (Attachment can include hydraulic hammers, augers, grapplers amongst other items.)
Operate the parking brake. Ensure personnel are not in front of bucket or attachment as it might roll.

Back      Buy Now $79.95 plus GST




 

OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
Safety Maintenance Log
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Work Method Statements (WMS)

Construction WMS
Residential Construction
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
OHS Auditing

On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits