Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Elevating Work Platform (EWP) - Scissor Lift SWMS

Elevating Work Platform (EWP) - Scissor Lift SWMS

Product SKU: 10233
Elevating Work Platform (EWP) - Scissor Lift SWMS Video
  • Product Description
  • Product Reviews
  • View Sample
Instant Download via Email
  • Complies with current legislation in all States and Territories
  • Instant Download delivered via email
  • MS Word and IAT (iAuditor App) format for easy customisation/editing
  • Downloading and Customising Instructions provided
  • Assists with compliance requirements for WHS inspections
  • Review Date: 9 July 2014

The Scissor Lift Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, main hazards, risks and controls associated with the use of a Scissor Lift or Mobile Elevating Work Platform.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Document Format
This Safe Work Method Statement (SWMS) is provided in the following document formats 

iat-word-files.jpg

 

app-store-badge.png google-play-badge.png

This SWMS includes: 

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • Review
  • References
  • Employee sign off section
  • Hierarchy of Controls
  • Risk Assessment Matrix

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.

Product details:

  • Written by ex WHS inspectors
  • Easy customisation with MS Word format (NOT PDF)
  • Risk ratings before and after control measures
  • Provides a framework for training workers
  • Can be used as part of tender applications, WHS inductions, and Toolbox talks

Related Items:

Write your own product review

Product Reviews


  1. EWP SWMS

    Posted by on

    Good package which addresses most issues well.

    Thankfully it wasn't too prescriptive about things such as lanyards being fitted to all handtools and equipment.
    Allows user disgression to close off area below instead.

    Much simpler and more easily understood by the workers than the template & SWM which came from the EWP hirer!!!

    Saved time and got the boys back to work as soon as possible when they were pulled up for not working in accordance with the EWP hirer's SWMS.

    Thanks for making life easier!


$79.95

PLUS GST

View Cart

You May Also Need...