Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Abrasive Blasting - Dry Air Powered SWMS

Abrasive Blasting - Dry Air Powered SWMS

Abrasive Blasting - Dry Air Powered SWMS Video

Other Details

PDF Download:
Abrasive_Blasting_-_Dry_Air_Powered_SWMS.pdf


  • Product Description
  • Product Reviews
  • View Sample
Instant Download via Email
  • Complies with current legislation in all States and Territories
  • Instant Download delivered via email
  • MS Word format for easy customisation/editing
  • Downloading and Customising Instructions provided
  • Assists with compliance requirements for WHS inspections
  • Review Date: 14 March 2014

The Abrasive Blasting - Dry Air Powered Safe Work Method Statement (SWMS) is a comprehensive  document outlining the safety steps, main hazards, risks and controls for using Dry Air Powered Abrasive Blasting (Sandblasting) equipment. This SWMS outlines prohibited blasting media which includes silica sand, river, beach or other white sands (containing more than 1-2% crystalline silica).

This SWMS includes: 

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • Review
  • References
  • Employee sign off section
  • Hierarchy of Controls
  • Risk Assessment Matrix

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.

Product details:

  • Written by ex WHS inspectors
  • Easy customisation with MS Word format (NOT PDF)
  • Risk ratings before and after control measures
  • Provides a framework for training workers
  • Can be used as part of tender applications, WHS inductions, and Toolbox talks

Related Items:

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart

You May Also Need...

 


ABOUT SSL CERTIFICATES