Loading... Please wait...

Aluminium Handrail Installation
 

Aluminium Handrails Installation SWMS

$79.95

PLUS GST

View Cart


Other Details

PDF Download:
Handrail_Installation_Aluminum_Work_Method_Statement_SWMS_V8.pdf


  • Product Description
  • Product Reviews

Product Description

Instant Download Delivery
This SWMS includes:
  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Transport
  • Installation
  • Completion
  • Emergency Procedures
  • References
 
Product Details:
  • 9 page procedure
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific
The Aluminium Handrail Installation Safe Work Method Statement (SWMS) is a comprehensive 10 page procedure outlining the safety steps for Installing Aluminium Handrails.
 
This SWMS covers installation of pre-fabricated, aluminium handrails for permanent structures. This does not include installation of temporary perimeter protection for the prevention of falls at construction sites.
 
The Aluminium Handrail Installation procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System. 
 
The Aluminium Handrail Installation Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
 
Planning

Assess intended work site. Ensure:
  • adequate lighting
  • sufficient room for employee and materials
  • suitable work platform
  • suitable weather conditions
  • traffic management controls are in place where required (barriers, exclusion zones etc)
  • location is not in close proximity to other hazardous works (hot works, excavating, work overhead etc)
  • Fall risks are mitigated (barriers, fall prevention etc)
  • Emergency/Rescue Plan in place 
  • Area is restricted to prevent unauthorised access
  • Kickboards/catch nets are installed as required
Write your own product review

Product Reviews

This product hasn't received any reviews yet. Be the first to review this product!


Need Help?

Can't find what you're looking for?

Call our customer service team

1300 306 604
Contact us via Email

Customer Service Availability
Mon-Fri 8:00am to 5:00pm AEST