Loading... Please wait...The Safety Procedure includes:
Product Details:
General Bobcat Safety Information:
The Bobcat/Skid Steer Loader Safe Work Method Statement (SWMS) is a comprehensive 10 page procedure outlining the safety steps for operation of a Bobcat/Skid Steer Loader.
Day Operations:
Safety footwear, hearing protection (ear plugs or muffs),high visibility shirt or vest, hard hat and sun protection if required (broad brim hat, sun screen, tinted safety glasses).
Night Operations:
As above but with a safety vest or shirt suitable for night work (i.e. D/N with reflective strips).
Planning to use a Bobcat/Skid Steer Loader
Ensure:
We Accept:
Can't find what you're looking for?
Call our customer service team
1300 306 604Customer Service Availability
Mon-Fri 8:00am to 5:00pm AEST