Safe & Happy Holidays from SafetyDocs!
Our team are on holiday from 5pm Fri 22nd Dec until 8:30am Tues 2nd Jan (AEST). Our store remains open 24/7 for instant product downloads.

A vehicle mounted drill in use

Vehicle Mounted Borehole Drilling Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Vehicle Mounted Borehole Drilling Safe Work Method Statement

This Vehicle Mounted Borehole Drilling Safe Work Method Statement (SWMS) covers hazards and controls associated with the operation of vehicle mounted auger drill rig.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Work in an area that may have a contaminated or flammable atmosphere
  • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

Additional controls are included for Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Vehicle Mounted Borehole Drilling SWMS:

(includes potential hazards and control measures)

  1. Provide Training on the Health Effects associated with Respirable Crystalline Silica Dust
  2. Travel To/From/Between Site
  3. Working Outdoors
  4. Arrival On-site & Assess On-site Conditions
  5. Work Area Set-up
  6. Environment
  7. Housekeeping
  8. Manual Tasks
  9. Hazardous Substance/Chemical Use
  10. Drilling
  11. Maintenance On-site
  12. Fuelling On-site
  13. On Completion
  14. Emergency Response

 

We've recently reviewed and updated this SWMS in line with the new Code of Practice for managing risks of plant in the workplace. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Vehicle Mounted Borehole Drilling Safe Work Method Statement

This Vehicle Mounted Borehole Drilling Safe Work Method Statement (SWMS) covers hazards and controls associated with the operation of vehicle mounted auger drill rig.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Work in an area that may have a contaminated or flammable atmosphere
  • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

Additional controls are included for Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Vehicle Mounted Borehole Drilling SWMS:

(includes potential hazards and control measures)

  1. Provide Training on the Health Effects associated with Respirable Crystalline Silica Dust
  2. Travel To/From/Between Site
  3. Working Outdoors
  4. Arrival On-site & Assess On-site Conditions
  5. Work Area Set-up
  6. Environment
  7. Housekeeping
  8. Manual Tasks
  9. Hazardous Substance/Chemical Use
  10. Drilling
  11. Maintenance On-site
  12. Fuelling On-site
  13. On Completion
  14. Emergency Response

 

We've recently reviewed and updated this SWMS in line with the new Code of Practice for managing risks of plant in the workplace. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.

PDF Download
PDF File

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View