Loading... Please wait...

Image 1
 

Brick Laying SWMS

$79.95

PLUS GST

View Cart


Other Details

PDF Download:
Brick_Laying_Work_Method_Statement_(SWMS)_V8.pdf


  • Product Description
  • Product Reviews

Product Description

Instant Download Delivery

The Brick Laying Safety Procedure includes:

  • Operators Requirements
  • Transporting
  • Planning
  • Site Awareness
  • Site Set-Up
  • Set Up For Heights
  • Daily Checks
  • Operation
  • Risk Ratings

Product Details:

  • 12 Page procedure
  • Written by ex WHS inspectors
  • Referenced 
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section

General Brick Laying Safety Information:

The Brick Laying Safe Work Method Statement (SWMS) is a comprehensive 12 page procedure outlining the safety steps of Brick Laying. 

The Brick Laying procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System. 

The Brick Laying procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.

Brick Laying Safety Notes 

When Brick Laying:

  • All employees involved within Bricklaying should be qualified / trained labourers.
  • Ensure the Mixer is positioned in the vehicle to avoid damage.
  • Ensure that all tools are adequately restrained.
  • Ensure that a trained first aid officer is always within the team involved in bricklaying activities.
Write your own product review

Product Reviews

This product hasn't received any reviews yet. Be the first to review this product!


Need Help?

Can't find what you're looking for?

Call our customer service team

1300 306 604
Contact us via Email

Customer Service Availability
Mon-Fri 8:00am to 5:00pm AEST