Loading... Please wait...

Circular Saw (Handheld)  SWMS
 

Circular Saw (Handheld) SWMS

$79.95

PLUS GST

View Cart


  • Product Description
  • Product Reviews

Product Description

The Safety Procedure includes:

  • Personal Protective Equipment
  • Operators Requirements
  • Pre-Start Checks
  • Safety Notes
  • Operation
  • Kick Back
  • Blade Vibration
  • Blade Replacement
  • General Maintenance
  • Risk Ratings

Product Details:

  • 11 Page procedure
  • Written by ex WHS inspectors
  • Referenced 
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

General Circular Saw Safety Information: (extract only)

The Circular Saw Safe Work Method Statement (SWMS) is a comprehensive 11 page procedure outlining the safety steps for use of a Circular Saw. 

The Circular Saw procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System. 

The Circular Saw procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.

Circular Saws:

  • Can generate noise in excess of 85 dB(A) so hearing protection is vital.
  • Are designed to cut and will cut through hands, arms etc. just as easy as wood. Safe work procedures must be adopted and adhered to.
  • Are designed for right-hand operation; left-handed operation requires greater concentration and training.
Write your own product review

Product Reviews

This product hasn't received any reviews yet. Be the first to review this product!

Need Help?

Can't find what you're looking for?

Call our customer service team

1300 306 604
Contact us via Email

Customer Service Availability
Mon-Fri 8:00am to 5:00pm AEST