Loading... Please wait...
Request a Quote

Let us help you get started with your health and safety obligations.

Request your free Safe Work Method Statement quote today!

1300 306 604

Let us create a safety compliance package that suits your needs.

Call us today to get your free quote!

Over 300, ready to use Safe Work Method Statements to choose from

1300 306 604

Compactor - Wacker Packer - Operation SWMS

Compactor - Wacker Packer - Operation SWMS

Compactor - Wacker Packer - Operation SWMS Video
  • Product Description
  • Product Reviews
Instant Download via Email
  • Complies with current legislation in all States and Territories
  • Instant Download delivered via email
  • MS Word format for easy customisation/editing
  • Downloading and Customising Instructions provided
  • Assists with compliance requirements for WHS inspections
  • Review Date: 14 March 2014

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, main hazards, risks and controls associated with the general use of a Vibrating Plate Compactor, known as a Wacker Packer on construction sites.

This SWMS includes: 

  • PPE
  • Safety Notes
  • Planning
  • Set-up and Pre-operation Inspection
  • Fuelling
  • Operation
  • Transport
  • Maintenance
  • Emergency Procedures
  • Review
  • References
  • Employee sign off section
  • Hierarchy of Controls
  • Risk Assessment Matrix

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.

Product details:

  • Written by ex WHS inspectors
  • Risk ratings before and after control measures
  • Provides a framework for training workers
  • Can be used as part of tender applications, WHS inductions, and Toolbox talks

Wacker Packer Safety Notes Extract

When Operating a Wacker Packer:

  • Never start the machine on a hard surface. Always start it on lose soil or gravel.
  • Ensure the engine is cool prior to re-fuelling.
  • Check that all safety devices and guards are in good working order before operating.
  • Always use the handle to guide the Wacker Packer.
  • Place the throtle in idle on completion.
Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart

You May Also Need...

 


ABOUT SSL CERTIFICATES