Loading... Please wait...

Image 1
 

Concrete Formwork SWMS

$79.95

PLUS GST

View Cart


Other Details

PDF Download:
Concrete_Formwork_Work_Method_Statement_(SWMS)_V8.pdf


  • Product Description
  • Product Reviews

Product Description

Instant Download Delivery

The Safety Procedure includes:

  • PPE
  • Safety Notes
  • Design Specifications
  • Preparation
  • Personnel Requirements
  • Risk assessment
  • Risk Control
  • Framework Erection- Traditional & False deck
  • Loading Materials
  • Prepour Inpsection
  • During concrete pour
  • Dismantling formwork (stripping)
  • Emergency Plan
  • References
  • Risk Ratings

It also comes with a list of Defects commonly found in Concrete Formwork and a Formwork Tool- Site Prompt and Report.

Product Details:

  • 14 Page procedure
  • Written by ex WHS inspectors
  • Referenced 
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section

General Concrete Formwork Safety Information:

The Concrete Formwork Safe Work Method Statement (SWMS) is a comprehensive 14 page procedure outlining the safety steps for Concrete Formwork. 

The Concrete Formwork procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System. 

The Concrete Formwork procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.

Formwork is the surface, supports and framing used to define the shape of concrete until the concrete is self-supporting. It includes the forms on which the concrete is poured, the supports to withstand the loads imposed by the forms and the concrete and any bracing added to ensure stability.

When Using Concrete Formwork:

  • Certification of design must be provided by a suitably qualified person.
  • All framing must be completed so it complies with on site design documentation and manufactures requirements.
  • Concrete should be inspected before dismantle.
Write your own product review

Product Reviews

This product hasn't received any reviews yet. Be the first to review this product!


Need Help?

Can't find what you're looking for?

Call our customer service team

1300 306 604
Contact us via Email

Customer Service Availability
Mon-Fri 8:00am to 5:00pm AEST