Concrete - Kerb - Channelling SWMS

Concrete - Kerb - Channelling SWMS

Concrete - Kerb - Channelling SWMS Video
  • Product Description
  • Product Reviews
Instant Download via Email
  • Complies with current legislation in all States and Territories
  • Instant Download delivered via email
  • MS Word format for easy customisation/editing
  • Downloading and Customising Instructions provided
  • Assists with compliance requirements for WHS inspections
  • Review Date: 14 March 2014

The Concrete Kerb and Channelling Safe Work Method Statement (SWMS) is a comprehensive 15 page procedure outlining the safety steps for the construction of extruded concrete kerb and channelling.

The Concrete Kerb and Channelling Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall WHS System.

This SWMS covers general aspects associated with using a concrete extruder for kerbing works.  This does not include form work, work at heights or use of machinery associated with concrete delivery in sufficient detail. A dedicated SWMS must be developed for these tasks as appropriate.

Main hazards:

  • Exposure to alkaline substances (skin -allergic and irritant dermatitis, eye, mucous membranes plus respiratory tract injuries)
  • Slips, trips, falls
  • Musculoskeletal Disorder (MSD) from hazardous manual tasks
  • Exposure to hazardous atmosphere – crystalline silica
  • Fire /explosion

Environmental Impact:

  • Noise
  • Contamination/Pollution

This SWMS includes the following High Risk Construction Work" as defined by Work Health and Safety Regulations 2011:

  • On or adjacent to a roadway
  • Close proximity to mobile plant
  • Possible live electricity, pressurized gas

The Concrete Kerb and Channelling Work Method Statement can be used as part of your WHS inductions, for Tool box talks or tender applications.

The Concrete Kerb and Channelling SWMS includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • Review
  • References

Related items:

  • Manual Handling – Hazardous Manual Tasks
  • Fuel Storage, Handling & Decanting
  • Traffic Management Plan

Operation: (extract ony)

Operate unit as per manufacturer’s instructions. Example:

  • Prepare ground surface / trenches as required
  • Mark out (example: string)
  • Ensure suitable cement materials available as per relevant quality standards
  • Place unit at starting point
  • Install front wheel upside down or remove
  • Place front end of the Slip Form where work will begin
  • Adjust wheels so Slip Form is at required height and unit will be level
  • Start-up as per manufacturer’s instructions
  • Allow unit to start completely before filling hopper. Feed concrete into hopper – do not overfill.
  • Do not exceed capacity of unit
  • Do not place tools into the hopper where they could catch on rotating parts and strike persons / cause entanglement
  • Keep all body parts clear of hopper and auger
  • Ensure unit is steered for correct kerb placement
  • Push/steer in a smooth motion.
  • Watch for roots or other obstructions. Ensure travel path allows suitable foot-hold. Do not work in overly muddy/wet conditions. Do not travel along gradients that exceed manufacturer’s specifications.
  • Always look in direction of travel
  • Ensure appropriate speed/output for conditions
  • Do not ride, or allow others to ride or lean on equipment

Finish by hand trowelling as required. Ensure sufficient control joints cut for conditions

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart

You May Also Need...

 


ABOUT SSL CERTIFICATES
Need Help?

Can't find what you're looking for?

Call our customer service team

1300 306 604
Contact us via Email

Customer Service Availability
Mon-Fri 8:00am to 5:00pm AEST