Loading... Please wait...The Concrete Vibrator Safe Work Method Statement (SWMS) is a comprehensive 6 page procedure outlining the safety steps for operating a Petrol Driven Concrete Vibrator.
The Concrete Vibrator procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Concrete Vibrator procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.
The Concrete Vibrator Safety Procedure includes:
(add a section from the procedure)
Preparation
Inspect equipment. Ensure:
- Unit is clean, free of oil, grease, concrete
- Sufficient oil/petrol
- No leaks
- Guards in place and undamaged
- Controls labeled and working
- No missing screw/bolts
- No cracked, broken or missing parts
- No misalignment or binding of moving parts
- Lock lever in place on cylindrical connector
- Hoses/couplings/vibrator head secured adequately
- Hoses undamaged, free of wear/tear
- Vibrator head/hose assembly suitable for make/model of unit
- Operator not fatigued or under influence of drugs/alcohol
- Hair tied back, no loose clothing or jewellery
- Operator able to handle vibratory force of unit
We Accept:
Can't find what you're looking for?
Call our customer service team
1300 306 604Customer Service Availability
Mon-Fri 8:00am to 5:00pm AEST