Loading... Please wait...

Image 1
 

Cut-Off Metal Saw SWMS

$79.95

PLUS GST

View Cart


Other Details

PDF Download:
Cut_off_Metal_Saw_Work_Method_Statement_(SWMS)_V8.pdf


  • Product Description
  • Product Reviews

Product Description

The Safety Procedure includes:

  • Risk Assessment
  • Clear Work Area
  • Clamp And Support Material
  • Protective Equipment
  • Switch On
  • Begin Cutting
  • Turning Off
  • Repairs
  • Risk Ratings

Product Details:

  • 10 Page procedure
  • Written by ex WHS inspectors
  • Referenced 
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

General Cut-Off Metal Saw Safety Information:

The Cut-Off Metal Saw Safe Work Method Statement (SWMS) is a comprehensive 10 page procedure outlining the safety steps for use of a Cut-Off Metal Saw. 

The Cut-Off Metal Saw procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System. 

The Cut-Off Metal Saw procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.

Cut-Off Metal Saw Safety Notes 

Before Operating A Cut-Off Metal Saw:

  • Clear area of any flammable liquids and materials.
  • Ensure there is sufficient lighting.
  • Put on full face head and hearing equipment.
  • Switch on machine and lower cutting wheel to commence cutting.
  • Watch for sparks and movement of other people in the area.
Write your own product review

Product Reviews

This product hasn't received any reviews yet. Be the first to review this product!

Need Help?

Can't find what you're looking for?

Call our customer service team

1300 306 604
Contact us via Email

Customer Service Availability
Mon-Fri 8:00am to 5:00pm AEST