Loading... Please wait...

Image 1
 

Dust Extractor SWMS

$79.95

PLUS GST

View Cart


Other Details

PDF Download:
Dust_Extractor_Work_Method_Statement_(SWMS)_V8.pdf


  • Product Description
  • Product Reviews

Product Description

The Safety Procedure includes:

  • Risk Assessment
  • Operators Requirements
  • Site Awareness
  • Operation
  • Emergency Procedures
  • Risk Ratings
  • MS Word Format
  • Multiple page procedure
  • Instant Download Delivery

General Dust Extractor Safety Information:

The Safe Work Method Statement outlines the Safety Steps required to operate a Dust Extractor Safely.

Dust Extractors need to be used with caution and appropriate safety procedures. The Dust Extractor procedure is Not A Blank Template. Safety Procedures can be edited or customised in MS Word if required.

Dust Extractor Safety Notes 

Before Operating A Dust Extractor:

  • No person shall service the dust extractor, unless trained to do so.
  • Some dry timbers can self-ignite.
  • Have a Class A fire extinguisher on standby.
  • Do not eat, drink or smoke around the equipment.
  • Lock-Off the extraction equipment.
  • If conditions are unsafe, evacuate to at least 50 meters.
References:

Victoria - Occupational Health and Safety Act 2004
Victoria - 
Occupational Health and Safety Regulations 2007
Victorian WorkCover Authority -
 Guidance Note - Wood dust - Health hazards and control
Australian / New Zealand Standard AS/NZS 1715:1994 -

United Kingdom - Control of Substances Hazardous to Health Regulations (COSHH)
Write your own product review

Product Reviews

This product hasn't received any reviews yet. Be the first to review this product!

Need Help?

Can't find what you're looking for?

Call our customer service team

1300 306 604
Contact us via Email

Customer Service Availability
Mon-Fri 8:00am to 5:00pm AEST