Safe & Happy Holidays from SafetyDocs!
Our team are on holiday from 5pm Fri 22nd Dec until 8:30am Tues 2nd Jan (AEST). Our store remains open 24/7 for instant product downloads.

Orange pedestrian operated forklift in a warehouse.

Forklift - Pedestrian Operated Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Forklift - Pedestrian Operated Safe Work Method Statement

This Forklift - Pedestrian Operated Safe Work Method Statement (SWMS) covers hazards and controls associated the operation of an electronically powered pedestrian operated forklift.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Work in an area that may have a contaminated or flammable atmosphere
  • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

Additional controls are included for Slips, Trips & Falls, Hazardous Substances, Out-of-Hours/Night Work, Hazardous Manual Tasks, Outdoor Work, Remotely &/or Isolated Work & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Forklift - Pedestrian Operated SWMS:

(includes potential hazards and control measures)

  1. Arrival On-site & Assess On-site Conditions
  2. Environment
  3. Housekeeping
  4. Manual Tasks
  5. Establish a Communication System with Pedestrian Ground Workers
  6. Working near Powered Mobile Plant
  7. Forklift Operation
  8. Hydraulic Equipment – Changing Attachments
  9. Charging Batteries
  10. On Completion
  11. Emergency Response
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Forklift - Pedestrian Operated Safe Work Method Statement

This Forklift - Pedestrian Operated Safe Work Method Statement (SWMS) covers hazards and controls associated the operation of an electronically powered pedestrian operated forklift.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Work in an area that may have a contaminated or flammable atmosphere
  • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

Additional controls are included for Slips, Trips & Falls, Hazardous Substances, Out-of-Hours/Night Work, Hazardous Manual Tasks, Outdoor Work, Remotely &/or Isolated Work & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Forklift - Pedestrian Operated SWMS:

(includes potential hazards and control measures)

  1. Arrival On-site & Assess On-site Conditions
  2. Environment
  3. Housekeeping
  4. Manual Tasks
  5. Establish a Communication System with Pedestrian Ground Workers
  6. Working near Powered Mobile Plant
  7. Forklift Operation
  8. Hydraulic Equipment – Changing Attachments
  9. Charging Batteries
  10. On Completion
  11. Emergency Response
PDF Download
PDF File

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View