Loading... Please wait...

Forklift - Loading - Unloading Trucks

Forklift - Loading - Unloading Trucks

Forklift - Loading - Unloading Trucks Video
  • Product Description
  • Product Reviews
Instant Download via Email
  • Complies with current legislation in all States and Territories
  • Instant Download delivered via email
  • MS Word format for easy customisation/editing
  • Downloading and Customising Instructions provided
  • Assists with compliance requirements for WHS inspections
  • Review Date: 14 March 2014

This SWMS covers underground service locating, using electronic detection method and equipment. Services include electricity, gas, potable water, steam, waste water (sewer/storm water) telecommunications, LPG/oil pipelines. This SWMS does not cover entering or working in Confined Spaces, trenches or areas where excavation has been done. This SWMS does not cover exposing services, excavation activities or servicing of underground utilities. Dedicated SWMS should be developed for these tasks, and for any risks not covered in this SWMS.

Main hazards:

  • Hit by moving vehicles
  • Falls
  • Vehicle accident

 The Trucks Loading and Unloading Work Method Statement can be used as part of your WHS inductions, for Tool box talks or tender applications.

 This SWMS includes: 

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Preparation
  • Loading
  • Unloading
  • Emergency Procedures
  • Review
  • References
  • Employee sign off section
  • Hierarchy of Controls
  • Risk Assessment Matrix

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.

Product details:

  • Written by ex WHS inspectors
  • Risk ratings before and after control measures
  • Provides a framework for training workers
  • Can be used as part of tender applications, WHS inductions, and Toolbox talks

Related Items:

Planning: (extract only)

  • Inspect intended loading area. Ensure:
    • No overhead services/power lines
    • Suitable ground surface/condition (soil condition, bridges, excavations, embankments, slopes, holes, drop-offs, pits, trees/root systems).
  • Ensure vehicle suitable for load. Check
    • Road worthy
    • Sufficient space for load
    • Gross Vehicle Mass (GVM), tyre and load capacity will not be exceeded
    • Correct design for type of load (long loads, correct load distribution)
  • Where required provide adequate traffic management. Include:
    • Witches hats/barricades/line markings
    • Caution signs/convex mirrors/alarms etc
    • Exclusion zone for pedestrians
    • Driver waiting area (visible to forklift operator)
Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart

You May Also Need...

 


ABOUT SSL CERTIFICATES
Need Help?

Can't find what you're looking for?

Call our customer service team

1300 306 604
Contact us via Email

Customer Service Availability
Mon-Fri 8:00am to 5:00pm AEST