Loading... Please wait...

Franna Loading/Unloading SWMS
 

Franna Loading/Unloading SWMS

$79.95

PLUS GST

View Cart


Other Details

PDF Download:
Franna-_Loading_and_Unloading_Trucks_Work_Method_Statement_(SWMS).pdf


  • Product Description
  • Product Reviews

Product Description

Instant Download Delivery

This SWMS includes:

  • PPE
  • Safety Notes
  • Planning
  • Pre-Operational Inspection
  • Preparation
  • Loading
  • Unloading
  • Operation
  • Maintenance
  • Emergency Procedures
  • Review
  • References
  • 19 Page procedure
  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section

Related Products:

  • Manual Handling - Hazardous Manual Tasks
  • Mobile Crane Operation
  • Spotters
  • Traffic Management Plan

Franna Loading and unloading Information:

This SWMS is a comprehensive 19 page procedure outlining the safety steps for the use of Mobile Cranes when loading and unloading trucks.

Once downloaded, this Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall WHS System.

This SWMS covers general aspects associated with loading and unloading trucks using mobile cranes. This does not include transfer of bulk goods (such as fuel) in tankers. It is advised that this SWMS be used in conjunction with Mobile Crane Operation SWMS.

Main hazards:

  • Hit by moving vehicles
  • Falls
  • Vehicle accident
  • Electric shock
  • Crushing
  • Musculoskeletal Injury (MSD) from hazardous manual tasks

The Franna- Loading and Unloading Trucks Work Method Statement can be used as part of your WHS inductions, for Tool box talks or tender applications.

Planning: (extract only)

Ensure all lifting attachments and lifting gear are suitable for the types of loads and used for their designed purpose. Ensure all equipment is marked with Safe Working Load (SWL).

Determine suitable loading/unloading sites. Ensure:

  • Clear of overhead services/power lines and other obstructions (buildings, tree branches, etc)
  • Suitable ground surface/conditions (check soil compaction and type, bridges excavations, embankments, slopes, holes, drop-offs, pits)
  • Sufficient room for operation of cranes
  • Clear travel path to / from delivery area

Note: Do not operate mobile cranes on soil that has been recently backfilled or in close proximity to trenches/pits etc. Seek Geological surveys as required.

Write your own product review

Product Reviews

This product hasn't received any reviews yet. Be the first to review this product!

Need Help?

Can't find what you're looking for?

Call our customer service team

1300 306 604
Contact us via Email

Customer Service Availability
Mon-Fri 8:00am to 5:00pm AEST