Loading... Please wait...

Image 1
 

Front End loader - Fertilizer Spreader Attachment SWMS

$79.95

PLUS GST

View Cart


Other Details

PDF Download:
Front_End_Loader_Attachment_-_Fertilizer_Spreader_Work_Method_Statement_(SWMS)_V8.pdf


  • Product Description
  • Product Reviews

Product Description

Instant Download Delivery
This SWMS includes:
  • PPE
  • Safety Notes
  • Planning
  • Pre start checks
  • Transport
  • Operation
  • Completion
  • Maintenance
  • Emergency Procedures
Product Details:
  • 12 Page procedure
  • Written by ex WHS inspectors
  • Referenced 
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery
The Front End Loader - Fertilizer Spreader Attachment Safe Work Method Statement (SWMS) is a comprehensive 12 page procedure which covers the use of a Front end loader with a fertilizer spreader attached. 
 
This procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System. 
 
This Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
 
Safety Notes: Inspect Loader
 
Ensure:
  • No fluid leaks
  • Hoses/couplings not cracked/split
  • Operator controls labelled
  • Safety decals in place and legible
  • Flashing lights/reversing beepers functioning (if installed)
  • Rear-view mirrors are present, functional and adjusted correctly
  • Cabin windows are clean and undamaged (if present)
  • Work lighting sufficient and functional
  • SWL displayed (where required)
  • ROPS installed (where required)
  • Tyres are undamaged, even pressure.
  • Spreader attachment compatible
  • Locking pins/clips for spreader attachments are available and undamaged
  • All safety guards are in place and undamaged
  • Seatbelt present and in good condition. 
  • Fire extinguisher present and secured
  • No debris, oil or tools present on deck, walkway or steps.
  • All stored items in cabin are secured.
Do not use if any fault/damage/missing parts. Report immediately and follow tag-out/lock-out procedures.
Related items:
  • Manual Handling
  • Front End Loader
Write your own product review

Product Reviews

This product hasn't received any reviews yet. Be the first to review this product!


Need Help?

Can't find what you're looking for?

Call our customer service team

1300 306 604
Contact us via Email

Customer Service Availability
Mon-Fri 8:00am to 5:00pm AEST