Loading... Please wait...

Image 1
 

Guillotine Use SWMS

$79.95

PLUS GST

View Cart


Other Details

PDF Download:
Guillotine_Work_Method_Statement_(SWMS)_V8.pdf


  • Product Description
  • Product Reviews

Product Description

Instant Download Delivery

The Guillotine - metal cutting Safety Procedure includes :

  • PPE
  • Safety notes
  • Planning
  • Pre-operational checks
  • Operation
  • Clean up
  • Emergency procedures and maintenance
  • References
  • 5 page procedure
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific

Guillotine- metal cutting Safety Information :

The Guillotine Safe Work Method Statement (SWMS) is a comprehensive 5 page procedure outlining the safety steps for cutting metal with a Guillotine.

The Guillotine procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand.

It is then ready for printing and to be incorporated as part of your overall OHS System. The Guillotine procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.

Pre-operational checks 

Inspect guillotine. Ensure :

  • Power cord undamaged/good condition.
  • No trip hazards present in work area.
  • Moving parts are lubricated and free of dirt/rust.
  • Feed table clear of debris.
  • Guards in place, undamaged (include any motor or fly wheels covers).
  • Emergency stop functional.
  • Area clear of other persons.
  • Controls labelled and working correctly.
  • Cutting table is free of scraps and tools.
  • Foot pedal is guarded to prevent accidental activation.

If missing or damaged parts, do not use. Report and tag out.

Ensure :

  • Rings, bracelets, watches etc are removed.
  • Long hair is tied back.
  • No loose clothing or gloves are worn during cutting.
Write your own product review

Product Reviews

This product hasn't received any reviews yet. Be the first to review this product!


Need Help?

Can't find what you're looking for?

Call our customer service team

1300 306 604
Contact us via Email

Customer Service Availability
Mon-Fri 8:00am to 5:00pm AEST