Loading... Please wait...

Harness System - Fall Arrest SWMS

Harness System - Fall Arrest SWMS

Harness System - Fall Arrest SWMS Video
  • Product Description
  • Product Reviews
Instant Download via Email
  • Complies with current legislation in all States and Territories
  • Instant Download delivered via email
  • MS Word format for easy customisation/editing
  • Downloading and Customising Instructions provided
  • Assists with compliance requirements for WHS inspections
  • Review Date: 14 March 2014

The Safety Harness Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps for the use of a safety harness. This SWMS covers the selection, inspection, fitting and use of a safety harness system for fall arrest.

Ensure an emergency response plan is developed, implemented and rehearsed for each site where persons are using a harness. The plan should ensure rescue of any fallen person wearing a harness is done within 5 minutes of fall. A person left for 15 minutes or more can die from suspension trauma.

This SWMS includes: 

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • Review
  • References
  • Employee sign off section
  • Hierarchy of Controls
  • Risk Assessment Matrix

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.

Product details:

  • Written by ex WHS inspectors
  • Easy customisation with MS Word format (NOT PDF)
  • Risk ratings before and after control measures
  • Provides a framework for training workers
  • Can be used as part of tender applications, WHS inductions, and Toolbox talks

Related Items:

Write your own product review

Product Reviews


  1. Thankyou! It helped greatly

    Posted by on

    It helped us in developing our own SWMS. This was fantastic in setting up a base and for us to develop on. It had everything we needed including all relevant codes of practice!


$79.95

PLUS GST

View Cart

You May Also Need...

 


ABOUT SSL CERTIFICATES
Need Help?

Can't find what you're looking for?

Call our customer service team

1300 306 604
Contact us via Email

Customer Service Availability
Mon-Fri 8:00am to 5:00pm AEST