Loading... Please wait...

Image 1
 

Heat Stress SWMS

$79.95

PLUS GST

View Cart


Other Details

PDF Download:
Heat_Stress_Work_Statement_Method_(SWMS)_V8.pdf


  • Product Description
  • Product Reviews

Product Description

Instant Download Delivery       
This SWMS includes:
  • PPE
  • Safety Notes
  • Identification
  • Risk Controls
  • Symptoms
  • Emergency Procedures
  • References
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific

Heat Stress Safe Work Method Statement:

This Safe Work Method Statement (SWMS) is a comprehensive procedure outlining the safety steps for Working in the Heat.

The Heat Stress procedure is ready to use and is not a blank template. Simply add your company details including your ABN, and include any site specific details or risks and make it specific to the task at hand.

It is then ready for printing and to be incorporated as part of your overall OHS System. The Heat Stress SWMS can be used as part of your OHS inductions, for Tool box talks or tender applications.

Employees can suffer illness from working in excessively hot environments (such as foundries, iron works etc). Heat is not based on air temperature alone, heat sources can come from high temperatures, radiant heat, high humidity, hot objects, or strenuous physical activity.

Heat stress illness can include:

  • fainting
  • heat stroke
  • fatigue/exhaustion
  • rashes (such as prickly heat) or heat cramps
  • worsening of pre-existing medical conditions

Heat Stress Risk Assessment Notes

Conduct an assessment to determine whether workers will be exposed to heat stress. Take the following into account

  • air temperature
  • humidity
  • radiant heat (sun, furnaces etc)
  • air movement/wind speed
  • workload (nature and duration)
  • physical capability of worker (acclimatisation, weight, fitness level, medications, existing medical conditions)
  • clothing and PPE required
Write your own product review

Product Reviews

  1. Heatwave SWMS

    Posted by Tony on 8th Feb 2013

    The SMWS gives good information for those looking for more details into Heat management and ways to work around heat scenarios. So easy to work with and make changes to it as you need to keep up the good work.


    --------------------------------------------------------------------------------


  2. Heat Stress SWMS

    Posted by Unknown on 4th Feb 2013

    This free product was a good one for our clients as it is something that they can develop into their own document without it appearing that we are pushing our company OHS onto them thus allowing them to manage their employees better when hot weather strikes.


  3. Not Bad

    Posted by Unknown on 29th Jan 2013

    I found it had relevant information but still needed some tweaking, but overall found it reasonably good. Some good nformation and clearly well thought through.


  4. Heatwave SWMS

    Posted by Mark on 21st Jan 2013

    This SMWS gives good information and references for those looking for more details into Heat management and ways to work around heat scenarios


  5. Heat Stress SWMS

    Posted by Sandy Alp on 18th Jan 2013

    The Safety Culture template provided a sound basis on which to develop OFSC compliant SWMS with not too much tweaking to bring it up to standard.


  6. heatwave

    Posted by Russell on 18th Jan 2013

    Very informative and helpful in an area that directly affects my business, a small fabrication workshop that regulary sees temperatures above 35 degrees in summer.


  7. Thanks...

    Posted by kerry on 18th Jan 2013

    What a great Idea to offer the SWMS - Heat Stress as a give away, especially as our days are getting hotter, and a SWMS that some of us would have overlooked; but very necessary. Kerp up the great work guys...


  8. Hot planet

    Posted by Unknown on 18th Jan 2013

    with the current heat wave most of Australia is experiencing the SWMS heat stress came out just in time for our staff to be warned of the risks involved while working outdoors in heat wave conditions. Being aware of the symptons will avert any long term or disatrous consequences of working outdoors in the hot weather conditions.



Need Help?

Can't find what you're looking for?

Call our customer service team

1300 306 604
Contact us via Email

Customer Service Availability
Mon-Fri 8:00am to 5:00pm AEST