Loading... Please wait...

Image 1
 

Hiab Truck Loader Crane SWMS

$79.95

PLUS GST

View Cart


Other Details

PDF Download:
Hiab_Truck_Loader_Work_Method_Statement_(SWMS)_V8.pdf


  • Product Description
  • Product Reviews

Product Description

Instant Download Delivery

This SWMS includes :

  • Risk assessment
  • Entering construction sites
  • Pre-start checks
  • Overhead wires
  • Stabilisers
  • Crane operation
  • On completion
  • Maintenance
  • Risk ratings
  • 3 page complete procedure
  • MS Word Format
  • Delivered via Email within 2 business hours

 

General Hiab Crane Safety Information :

Hiab Cranes are now found being used on most construction sites and in many other industries. Loading and unloading with a Hiab Crane can be performed safely, provided Safe Work Procedures are followed.

The Hiab Crane SWMS is not a blank template. Safety procedures can be edited or customised in MS Word if required.

Hiab Crane Safety Information

Hiab General Operation :

  • Operator should be positioned on the opposite side of the truck to that which the load will be lifted or lowered.
  • Operator should have a clear view of the area where the load will be lifted from or lowered onto.

Ensure :

  • That loads will not become snagged which may cause equipment failure. This may require an observer or guide ropes to be attached. Example Loading/unloading pipes.
Write your own product review

Product Reviews

This product hasn't received any reviews yet. Be the first to review this product!

Need Help?

Can't find what you're looking for?

Call our customer service team

1300 306 604
Contact us via Email

Customer Service Availability
Mon-Fri 8:00am to 5:00pm AEST