Loading... Please wait...

Manual Handling – Hazardous Manual Tasks SWMS

Manual Handling – Hazardous Manual Tasks SWMS

Manual Handling – Hazardous Manual Tasks SWMS Video

Other Details

PDF Download:
Manual_Handling_SWMS_Sample_2015.pdf
Product Video:


  • Product Description
  • Product Reviews
Instant Download via Email
  • Complies with current legislation in all States and Territories
  • Instant Download delivered via email
  • MS Word format for easy customisation/editing
  • Downloading and Customising Instructions provided
  • Assists with compliance requirements for WHS inspections
  • Review Date: 30 July 2014

The Manual Handling-lifting Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, main hazards, risks and controls associated with Manual handling includes all physical activity. Manual handling tasks only present a risk when they are considered hazardous. Hazardous manual tasks can lead to injuries that are called “Musculoskeletal Injuries” or MSD’s.

The SWMS covers the requirement to identify, assess and control manual handling risks in relation to lifting tasks across numerous industries including construction, manufacturing, hospitality etc. This does not provide specific risk controls in relation to people-handling in health care settings.

This SWMS includes: 

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • Review
  • References
  • Employee sign off section
  • Hierarchy of Controls
  • Risk Assessment Matrix

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.

Product details:

  • Written by ex WHS inspectors
  • Easy customisation with MS Word format (NOT PDF)
  • Risk ratings before and after control measures
  • Provides a framework for training workers
  • Can be used as part of tender applications, WHS inductions, and Toolbox talks
Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart

You May Also Need...

 


ABOUT SSL CERTIFICATES
Need Help?

Can't find what you're looking for?

Call our customer service team

1300 306 604
Contact us via Email

Customer Service Availability
Mon-Fri 8:00am to 5:00pm AEST