Loading... Please wait...

Image 1
 

Mitre Saw SWMS

$79.95

PLUS GST

View Cart


Other Details

PDF Download:
Mitre_Saw_Work_Method_Statement_(SWMS)_V8.pdf


  • Product Description
  • Product Reviews

Product Description

Instant Download Delivery
Product Details:
  • 6 Page Complete Procedure
  • MS Word Format
  • Easy to add site details and risks
  • Version 5.0

The Mitre Saw or Compound Drop Saw Safe Work Method Statement is a 6 page Safety procedure covering the risks involved with using a Mitre Saw and the control measures to counter those risks.

The Mitre Saw Safe Work Method Statement includes:

  • Personal Protective Equipment (PPE)
  • Safety Notes
  • Operators requirements
  • Transporting
  • Site Awareness
  • Preparation
  • Operation
  • On Completion
  • References
  • Risk Ratings

Before Operating A Mitre Saw:

  • Set it up in a location that is clear of others, has sufficient light, a near by source of power and comfortable room.
  • Always ensure all appropriate PPE is worn
  • Use the non-preferred hand to hold timber the in place.
  • Never cross arms whilst using the saw.
Write your own product review

Product Reviews

This product hasn't received any reviews yet. Be the first to review this product!


Need Help?

Can't find what you're looking for?

Call our customer service team

1300 306 604
Contact us via Email

Customer Service Availability
Mon-Fri 8:00am to 5:00pm AEST