Loading... Please wait...

Image 1
 

Pressure Cleaner - Petrol SWMS

$79.95

PLUS GST

View Cart


  • Product Description
  • Product Reviews

Product Description

Instant Download Delivery

High Pressure Cleaner - Petrol Operated SWMS includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation and Set Up
  • Operation
  • Refueling
  • Maintenance
  • References
  • 5 page procedure
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific

High Pressure Cleaner - Petrol Operated Safe Work Method Statement:

The Petrol Operated High Pressure Cleaner Safe Work Method Statement (SWMS) is a comprehensive 5 page procedure outlining the safety steps for using a High Pressure Cleaner. This SWMS covers the use of the petrol operated high pressure cleaner with cold water.

If using hot water, read the manufacturer’s instructions for further precautions. The Petrol Operated High Pressure Cleaner procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand.

It is then ready for printing and to be incorporated as part of your overall OHS System. The High Pressure Cleaner - Petrol Operated procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.

Shut off unit and allow cooling before refueling. Never refuel while motor running.

Do not smoke and ensure refueling is undertaken in well ventilated area (outside, and clear of ignition sources).

Remove cap slowly.

Fill tank and wipe away excess. Ensure cap replaced securely. Check for leaks.

Move at least 3m from refueling site before starting unit.

Write your own product review

Product Reviews

This product hasn't received any reviews yet. Be the first to review this product!

Need Help?

Can't find what you're looking for?

Call our customer service team

1300 306 604
Contact us via Email

Customer Service Availability
Mon-Fri 8:00am to 5:00pm AEST