Rendering – Cement SWMS

Rendering – Cement SWMS

Rendering – Cement SWMS Video

Other Details

PDF Download:
Cement_Render_-_General_Application_Work_Method_Statement_(SWMS)_V8.pdf


  • Product Description
  • Product Reviews
Instant Download Delivery
  • Provides a framework for training workers
  • Addresses generic risks and hazards
  • MS Word format allows you to make changes to the document
  • Can be used as part of tender applications, WHS inductions, and Toolbox talks
  • Assists with compliance requirements for WHS inspections

The Cement Render Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps for cement rendering.

This SWMS covers the task of cement rendering on walls of buildings.

Safety Data Sheets (SDS) must be obtained for all chemicals (cement & cement products) that are to be used during this task.

This SWMS does not cover working on scaffolds, working on trestles, working on ladders, using a cement mixer and working with hazardous chemicals in sufficient detail. Dedicated SWMS should be obtained and developed for these tasks, and for any risks not covered in this SWMS.

It is recommended that SWMS specifically covering the following tasks should be used in conjunction with the Cement Rendering SWMS:

- Working on Scaffolds

- Working on Trestles

- Working on Ladders

- Work at Heights

- Cement Mixer (Powered or Petrol) – if applicable

This SWMS includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Application of Render
  • Maintenance
  • Emergency Procedures
  • Review
  • References

This SWMS is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall WHS System.

Product Details:

  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Review Date: 14 March 2014

Related items:

  • Manual Handling – Hazardous Manual Tasks
  • Scaffolding – Use of
  • Heights – Safe working at
  • Ladder Safety

Product extract:

Rendering:

-      Surface is rough to allow a good adhesion and/or a bonding product is applied.

If bonding product is used it can be applied to the surface

and added to the mix. Alternatively apply a dash coat, which is splattered or flicked onto the surface to give a rougher surface to accept the finish coat.

-      Surface should be dampened.

-      The required number of coats is applied.

-      In dry conditions to ensure that cracking does not occur, render will be kept damp for an appropriate period. (2-3 days.)

-      Apply render onto the surface by floating with a steel float. The render should be smoothed as work progresses.

-      Ensure surface is flush and level by finishing with a large float.

-      Plaster as required after the render has set.

-      Ensure that render surface is totally dry before any other work is carried out. 

Write your own product review

Product Reviews


  1. Has everything you need for a basic rendering SWMS

    Posted by on

    After spending over a week trying to do up my own SWMS for mine and my husbands new business, it was taking up so much time that I didn't have. After having a look at my options online, safety culture was not only great on price but had exactly what I needed and it literally took 5 minutes to buy and print out. I felt very relieved :)
    10/10
    Thanks guys!


$79.95

PLUS GST

View Cart

You May Also Need...

 


ABOUT SSL CERTIFICATES
Need Help?

Can't find what you're looking for?

Call our customer service team

1300 306 604
Contact us via Email

Customer Service Availability
Mon-Fri 8:00am to 5:00pm AEST