Loading... Please wait...

Image 1
 

Rigging SWMS

$79.95

PLUS GST

View Cart


Other Details

PDF Download:
Rigging_Work_Method_Statement_(SWMS)_V8.pdf


  • Product Description
  • Product Reviews

Product Description

Instant Download Delivery

The Safety Procedure includes:

  • Risk Assessment
  • Site Awareness
  • Operators Requirements
  • Personal Protective Equipment
  • Pre-Start Checks
  • Dogman Instructions
  • Eye bolts, Slings
  • Weights
  • Risk Ratings
  • And much more
  • 5 Page Complete Procedure
  • MS Word Format
  • This Is Not A Blank Template

General Rigging Safety Information:

The Rigging Safety Procedure has been developed for employers to implement a site and company safety procedure for employees and contractors to perform Rigging tasks safely.

The document can be used as part of a Safety Induction or simply implemented into an existing OHS System.

Before Lifting:

  • Inspect harness for damage
  • Inspect and insure correct operation of inertia reel.   
  • Check that the anchor point or static line are correctly located and have not been damaged.
  • Ensure that the harness is correctly fitted, adjusted and connected to anchor point or static line.

Rigging With Chains

Check for damage such as:

  • Stretching or bending of links
  • Small dents on the surface of links
  • Wear on parts of the links that seat each other
  • Deformation
  • Rust, nicks or gouges, pitting or corrosion and
  • Links that are locked or without free movement.
References:

Queensland Workplace Health and Safety Regulation 1997 - Schedule 5 Prescribed occupations
New South Wales – WorkCover - Occupational Health and Safety Regulation 2001
New South Wales - WorkCover– Rigging- National Certificate of Competency
Victoria - Occupational Health and Safety (Certification of Plant Users and Operators) Regulations 1994
Canadian Centre for Occupational Health and Safety – Lifting with Eye Bolts
SafetyCulture – Safe Work Procedures – Safety Harnesses – Scaffolding – Ladders (Safe use of) -
Write your own product review

Product Reviews

This product hasn't received any reviews yet. Be the first to review this product!


Need Help?

Can't find what you're looking for?

Call our customer service team

1300 306 604
Contact us via Email

Customer Service Availability
Mon-Fri 8:00am to 5:00pm AEST