Safe & Happy Holidays from SafetyDocs!
Our team are on holiday from 5pm Fri 22nd Dec until 8:30am Tues 2nd Jan (AEST). Our store remains open 24/7 for instant product downloads.

rubbish loaded into the back of a ute.

Rubbish Removal Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Rubbish Removal Safe Work Method Statement

This Rubbish Removal Safe Work Method Statement (SWMS) covers hazards and controls associated with rubbish removal from a property.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

Additional controls are included for Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Rubbish Removal SWMS:

(includes potential hazards & control measures)

  1. Provide Training on the Health Effects Associated with Respirable Crystalline Silica Dust
  2. Working Outdoors
  3. Planning
  4. Travel to Site & Waste Station
  5. Arrival On-site & Assess On-site Conditions
  6. Environment
  7. Housekeeping
  8. Loading Rubbish
  9. Unloading at Landfill
  10. Fuelling
  11. On Completion
  12. Emergency Response
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Rubbish Removal Safe Work Method Statement

This Rubbish Removal Safe Work Method Statement (SWMS) covers hazards and controls associated with rubbish removal from a property.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

Additional controls are included for Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Rubbish Removal SWMS:

(includes potential hazards & control measures)

  1. Provide Training on the Health Effects Associated with Respirable Crystalline Silica Dust
  2. Working Outdoors
  3. Planning
  4. Travel to Site & Waste Station
  5. Arrival On-site & Assess On-site Conditions
  6. Environment
  7. Housekeeping
  8. Loading Rubbish
  9. Unloading at Landfill
  10. Fuelling
  11. On Completion
  12. Emergency Response
PDF Download
PDF File

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View