Loading... Please wait...The Sandblasting includes:
Product Details:
Sandblasting Information:
The Sandblasting Safe Work Method Statement (SWMS) is a comprehensive 12 page procedure outlining the safety steps for using Dry Air Powered Abrasive Blasting (Sandblasting) equipment. This SWMS outlines prohibited blasting media which includes silica sand, river, beach or other white sands (containing more than 1-2% crystalline silica).
The Sandblasting procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Sandblasting procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.
Use suitable blast media:
Obtain MSDS (Material Safety Data Sheet) for blasting media, solvents, finishing sprays etc.
Develop task or site specific SWMS
Related Products:
We Accept:
Can't find what you're looking for?
Call our customer service team
1300 306 604Customer Service Availability
Mon-Fri 8:00am to 5:00pm AEST