Loading... Please wait...

 

Sander - Horizontal and Vertical SWMS

$79.95

PLUS GST

View Cart


  • Product Description
  • Product Reviews

Product Description

Instant Download Delivery

This SWMS includes:

    • PPE
    • Safety Notes
    • Planning
    • Pre-operational Inspection
    • Operation
    • Completion
    • Maintenance
    • Emergency Procedures
  • 4 page procedure
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific

Pre Operational Inspection

Inspect sander. Ensure:

  • Instructions for safe use available and legible.
  • Controls are labelled and functional
  • Power cord undamaged/good condition
  • No trip, slip hazards present in work area
  • No exposed moving parts
  • Sanding belt in good condition and tightly fitted
  • Belt guards in place and undamaged
  • Motor guards in place and undamaged
  • Locking devices (between horizontal and vertical placement) available and functional
  • Table positioned correctly for job.

Note: Do not position table below sanding belt. Overlap at least 10mm to avoid material or fingers getting caught.

Sander Horizontal and Vertical Safety Information:

The Horizontal and Vertical Sander Safe Work Method Statement (SWMS) is a comprehensive procedure outlining the safety steps for Operation of a Horizontal/Vertical Sander.

The Operation of Horizontal/Vertical Sander procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Operation of Horizontal/Vertical Sander Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

References 
OHS Legislation in all States
National Standard for Plant [NOHSC:1010(1994)]
Queensland Code of Practice for Plant
St. Johns Ambulance – First Aid Advice
AS 1473 – 1991. Guarding and Safe Use of Woodworking Machinery
Jet Equipment and Tools EHVS-80CS Horizontal/Vertical Sander

Write your own product review

Product Reviews

This product hasn't received any reviews yet. Be the first to review this product!


Need Help?

Can't find what you're looking for?

Call our customer service team

1300 306 604
Contact us via Email

Customer Service Availability
Mon-Fri 8:00am to 5:00pm AEST