Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Shade Sail Installation SWMS

Shade Sail Installation SWMS

Product SKU: 10418
Shade Sail Installation SWMS Video
  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download Delivery
  • Provides a framework for training workers
  • Addresses generic risks and hazards
  • MS Word format allows you to make changes to the document
  • Can be used as part of tender applications, WHS inductions, and Toolbox talks
  • Assists with compliance requirements for WHS inspections
  • Review Date: 14 March 2014

The Shade Sail Installation Safe Work Method Statement (SWMS) is a comprehensive document outlining the general safety issues associated with installation of shade sails in outdoor locations. This SWMS includes installation works at existing domestic dwellings, schools and construction sites. This SWMS does not cover the use of a power driven Post Hole Digger.

This SWMS includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • Review
  • References

This SWMS is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall WHS System.

Product Details:

  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section

Related items:

  • Manual Handling – Hazardous Manual Tasks
  • Post Hole Digger
  • Heights – Working at

Product extract:

For existing premises, assess:

-       Presence of potentially aggressive persons or dangerous animals

-       Presence of asbestos in relevant roof or wall section

-       Presence of concrete (silica dust) if drilling through cement is required

-       Space to conduct work and access/egress points

-       Disposal requirements for materials.

Schools – Liaison with School management to determine if “Working With Children Check” documentation is required for workers and/or supervision requirements to meet Child Protection Policies and Procedures at the school. Legislative requirements vary between States and schools must have systems in place to cover contract workers whilst on site.

Assess the exposure of workers to noise, including the frequency of exposure to noise levels that exceed the legislated Exposure Standard while working in construction zones, and/or using powered hand tools and determine required controls such as Audiometric Testing and PPE.  Refer to Noise Control SWMS for detailed information regarding the prevention of hearing loss and legislative requirements.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


QMS Special
Take $150 OFF Quality Management System Sale.

Add coupon code QUALITY at checkout.

You May Also Need...